This project consisted of the design of the Electrical, Interior Lighting, HVAC, Plumbing, Refrigeration and Sprinkler Systems for a new 74,000sf Refrigerated/Freezer/Dry Storage Warehouse facility for the Atalanta Corporation. The project consisted of a mezzanine office space, Bonded Dry Storage, Non-Bonded Dry Storage, Freezer Storage, Refrigerated Loading Dock and support spaces. The Dry Storage areas were designed to be easily converted to refrigerated storage. The project is complete.
